March 14, 2025


    The very beginning of the elevator construction, clearing the work area. 

The work site from above. The elevator is going in right next to the window on the bottom. The bottom two green caps are the clean out access to the septic tank, the top one is the cleanout access for the dosing tank. The septic system engineers really like to use a dosing pump now so that the septic field is completely used. A purely passive system just drips into the field and therefor only the area immediatly around the septic tanks outlet pipe gets used.

Looking north. The elevator is going to go into the corner. Some of the South Guest Patio at the left will have to be demo’ed out.

Looking west.