10/17/2019 


Most of the steel decking that the concrete will be poured on has been placed. The footers for the walls that define The Grotto are poured.

Two views of the steel decking. The last pieces can’t be placed until all the underfloor drains are placed.

The Grotto footer. The flat sheets stacked in the right are what will be used to form up these walls. These walls would have been poured at the same time as the rest, if we’d understood just how much volume the “crawl space” on the plans represented.